Topglass GC FR 50 Installed on NZ Post's Hamilton distribution centre

Topglass GC FR 50 fire and smoke retardant natural lighting and cladding solution supplied by Alsynite One NZ was used as the best roofing requirement option for a brand new 8000m2 building at Te Rapa Gateway.

NZ Post Hamilton distribution centre 001

For this multi-million dollar purpose-built mail hub project in Hamilton, installers went for Topglass GC FR50 supplied with EXO-SET 206 Gelcoat weather surface coating cause of his offering of exceptional resistance against  corrosive atmospheres and providing protection against solar deterioration. The hub is a base for around 60 posties, 13 rural delivery contractors and 35 couriers, plus between 30 and 50 support staff.

 Installation was completed by Lee Roofing, who took to installing the Topglass GC FR 50 product as a perfect specification and application option. This specific building required a roofing solution with reduced ignitability, flame propagation and heat and smoke release over conventional resin systems.

For more information please see our Topglass pages.

Back to news

News

Topglass GC FR 50 Installed on NZ Post's Hamilton distribution centre

Topglass GC FR 50 fire and smoke retardant natural lighting and cladding solution supplied by Alsynite One NZ was used as the best roofing requirement option for a brand new 8000m2 building at Te Rapa Gateway.

Read more

Alsynite sale to PT Impack Pratama Industri Tbk

Effective 1st August 2017 the business and assets of Alsynite NZ ltd were purchased by Alsynite One NZ Ltd

Read more

Here Now - Laserlite Lap Connector

Polycarbonate sheet is a fantastic material as it is light strong and translucent, but there are 2 problems caused by the way we use it …

Read more
More News